Letter to shri.Jayachandra, CE,- BBMP

H.B.R LAYOUT 5TH BLOCK RESIDENTS ASSOCIATION


D.No.1489, 17th C main, 5th block, HBR layout, 1st stage, Bangalore-560043

____________ _________ _________ _

To                                                                                                                        29th Dec ‘09

Shri.S.C.Jayachandr a, B.E, K.E.S
Chief Engineer (East), BBMP,
P.U Building, M.G. Road ,
Bangalore-560001 (via email: report.ceeast@rediffmail.com)

Dear Sir,

Sub: Your visit to our HBR 5th block layout on 18th Dec ’09 and the instructions given to Mr.Vijayakumar to carry out long pending over due civic problems.

We thanked and kept you informed that the de-silting work of SWD and removal of debris work is progressing well. But to our dismay suddenly the JCP and the equipments used for removal of debris in 30th C cross (KEB road) had stopped coming from 23rd. and they worked for only two days. The other JCP used for de-silting was continued to work till 24th. Our concern is that whatever development work is taken up by BBMP is half done and always incomplete.
For example:
1. The asphalting of roads has been undertaken for only some roads and has not been completed and other roads were left out.
2. Revamping of side drains, done only in some roads and many roads were left out.
3. Canal side walls for SWD near 19th main road bridge, done partially on only one side and other side was left out for years.
4. Fencing on both sides of SWD, only a half stretch is completed and is lying incomplete.
5. Foot path with concrete blocks was made in 19th main on one side of the road, that too half stretch.
6. Side drains were cleaned for debris and garbage in some roads only.
Besides above unfinished works, we also have unattended works for which a copy of complaint had already been handed over to you during your visit here on 18th Dec ‘09.
We were expecting works of both de- silting and debris removal will be resumed today. But to our surprise no one turned up for the work till 12 noon. So we are very unhappy the way things are handled.

We are very unclear and do get an impression that the current sitting officers and engineers of BBMP in charge of our layout may not be visiting/inspecting while the developmental work is taking place. As we don’t have any faith on Mr. Vijayakumar as he always evades our phone calls, we request you to kindly monitor the on going work and see that all the pending works goes on smoothly without any stoppage.

By your name "Jayachanra=Jaya+ chandra means success and moon, we hope you will succeed in throwing cool moon light on the cursed people of this layout".

We hope you will come forward and take initiative to solve our long pending, hazardous and life threatening problems.
Thanking you,
Regards
A.Rajagopal
Treasurer
Copy to:
Mr. Bharath Lal Meena, I.A.S
Commissioner,
 BBMP,
Bangalore . (With a request to look into the matter).