To 8th Jan ‘09
The Chief Executive Engineer,
SWD, North,
Bangalore.
Email: jagagowda@yahoo.co.in
Dear Sir,
Sub: Canal side walls and Fencing work of open SWD in HBR layout, 5th block, 1st stage.
Please refer to our letter dt; 10th Dec 09, addressed to Hon’ble Chief Minister regarding Storm water drain posing serious health hazard to the residents of HBR layout 5th block,1st stage, Bangalore-5600043. This letter will speak in volumes about the sufferings of our layout residents. As you are going to take up the left out portion of fencing work of open SWD, i.e. from Walkover Bridge to 19th main bridge, we would like to request you to kindly take up the work of constructing side walls for the SWD beyond 19th main bridge also simultaneously.
SWD seen without side walls
SWD with side wall on one side, that too for a small length
The above photos illustrate the condition of the SWD beyond 19th main bridge. The side wall was constructed on one side only for a very short length and the work was stopped mid way. As there is neither a side walls nor any fencing to the SWD many construction people from neighboring and far off places are dumping the debris here day and night. Due to this there is a hindrance in the flow of sewage water and the same stagnates becoming a breeding place for mosquitoes and other insects and foul smell emanate from this stagnated water. . We are also attaching the video clip
(link: http://www.youtube.com/watch?v=lQBUN4iVEYk) of SWD for your reference.
Thanking you,
With regards
A.RajagopalTreasurer